Description:
A new $53 million San Marcos Unified School District project composed of several buildings on a 42-acre site, featuring 11 two-story buildings, a quadrangle and parking for up to 1,200 cars. Included in the project was a 2,600-seat football stadium with concrete bleachers, synthetic turf field, rubber track and full support amenities; gymnasium; baseball and softball fields; two soccer fields; 10 outdoor basketball courts; and 10 outdoor tennis courts. The buildings utilize 8-inch, 12-inch and 16-inch thick masonry walls. The gymnasium utilizes two, 2 foot 8 inch by 3 foot 4 inch masonry pilasters up to 42 feet tall with a full height steel column at the core to facilitate anchorage to the roof trusses. Gym pilasters support steel trusses that clear span more than 140 feet. The building lateral systems consist of masonry shear walls, concrete shear walls and steel braced frames. Masonry retaining walls on the site are up to 26 feet tall and masonry lintels span up to 44 feet.
Services:
Grading Control
Soils Compaction
Footings Inspection
Special DSA Inspection
Concrete
Masonry
Steel
Non Destructive Testing
Batch Plant
Shop Welding Verification
Waterproofing
Roofing
Laboratory:
Provided All Mix Design
Concrete
Mortar
Grout
Materials Testing Services
Concrete
Steel
Masonry
Grout
Mortar
Soils