Location: |
San Diego, CA |
Client: |
Mr. Kip Howard Allegis Development (619) 238-5466 |
Description: |
A 253-room,12-story Hilton hotel, with an adjoining four-level 32,000 sf of mixed-use facility (retail, restaurant, and apartments), loft style/office space, and below -grade parking for 137 vehicles. A terrace level and courtyard on the second story includes a swimming pool and spa facility. Construction of the facility included extensive cast-in-place reinforced concrete, post-tension concrete, reinforced masonry, and structural steel construction. |
Services: | |
|
Engineering Review |
|
Geotechnical |
Shoring Design Review and Inspection | |
Foundation Inspection and Certification | |
Soil Testing and Inspection | |
Asphalt Compaction Testing and Inspection | |
|
Special Inspection and Testing |
Reinforced Concrete | |
Masonry | |
Field Welding | |
Non-Destructive Examination Of Welds (NDE) | |
Fireproofing | |
EIFS Inspection | |
Laboratory: | |
|
Materials Testing |
Concrete | |
Reinforced Concrete | |
Masonry Prisms | |
Grout | |
Mortar | |
High Strength Bolts | |
Fireproofing | |
Pre-Stressing Strands | |
Soils Testing |