Hilton San Diego Gaslamp Quarter Hotel

Location:
San Diego, CA
Client:
Mr. Kip Howard
Allegis Development
(619) 238-5466
Description:
A 253-room,12-story Hilton hotel, with an adjoining four-level 32,000 sf of mixed-use facility (retail, restaurant, and apartments), loft style/office space, and below -grade parking for 137 vehicles. A terrace level and courtyard on the second story includes a swimming pool and spa facility. Construction of the facility included extensive cast-in-place reinforced concrete, post-tension concrete, reinforced masonry, and structural steel construction.
Services:
Engineering Review
Geotechnical
Shoring Design Review and Inspection
Foundation Inspection and Certification
Soil Testing and Inspection
Asphalt Compaction Testing and Inspection
Special Inspection and Testing
Reinforced Concrete
Masonry
Field Welding
Non-Destructive Examination Of Welds (NDE)
Fireproofing
EIFS Inspection
Laboratory:
Materials Testing
Concrete
Reinforced Concrete
Masonry Prisms
Grout
Mortar
High Strength Bolts
Fireproofing
Pre-Stressing Strands
Soils Testing
Close Window