Location: |
Lakeside, CA |
Client: |
Mr. Les Stanley Barona Valley Ranch Casino & Resort Construction (619) 443-2300 |
Description: |
The project included the construction of a new $20 million dollar, 780,000 square foot, five-level, parking garage. 7.8 million pounds of reinforced steel was combined with 26,000 cubic yards of concrete made at the casino’s on-site concrete batch plant. The parking garage will accommodate 2,270 vehicles, and is part of the larger $240 million dollar Barona Casino, Hotel, and Events Center Expansion project. |
Services: | |
![]() |
Geotechnical Engineer of Record |
Grading Control | |
Footing Inspections | |
Retaining Wall Inspections | |
All Follow-On Soils Work | |
Soils Compaction | |
![]() |
Quality Assurance Inspection and Inspection |
Reinforced Concrete | |
Post-Tensioned Concrete | |
Reinforced Masonry | |
Field Welding | |
Non-Destructive Examination Of Welds (NDE) | |
Epoxy Bolting And Dowels | |
Fireproofing | |
Waterproofing | |
Roofing | |
Building Inspection | |
Elevator Inspection | |
Laboratory: | |
Concrete | |
Masonry | |
Mortar | |
Grout | |
Fireproofing Densities | |
All Soils Testing |